Energy performance contracting (EPC)

Reduce your emissions without your own investment. Are you wondering how to reduce your emission footprint? Are you considering the construction or overall modernization of your buildings with guaranteed savings?

I wish to calculate my savings

What can you expect from us?

We implement smart and energy-saving measures, which are a comprehensive set leading to reduced energy intensity.

WE BEGIN EVERY EPC PROJECT WITH THE CURRENT STATE ANALYSIS AND PROPOSED ENERGY SAVING MEASURES

WE ALSO OFFER THE COMPLETE IMPLEMENTATION OF PROPOSED MEASURES

THE GUARANTEED AMOUNT OF SAVINGS IS ANCHORED IN OUR CONTRACT, WE USE THEM FOR THE IMPLEMENTATION FUNDING

Our solution is suitable for engineering companies, food, chemical and pharmaceutical industries. Furthermore, for storage and distribution halls, commercial buildings, cities, state-funded organizations, universities, and medical and cultural facilities.

Contact ČEZ ESCO experts

EPC stands for “Energy Performance Contract”. These are, therefore, energy services with a guaranteed result according to the law. That is why we are able to guarantee you a minimum level of operating cost savings in advance. In addition, we will enable you to increase the effectiveness of your operation in the long run or, for example, to transfer all the financial and technical risks associated with the project to your supplier.

A novelty is the PDB cost-saving measure (Performance design & build) – design and construction of an energy-effective building with its guaranteed low operating costs.

What are the other benefits for you?

Up to 50% reduction of the total costs When applying the energy performance contract (EPC)
Up to 15% of energy consumption will be reduced through the energy management introduction
Up to 75% of electricity consumption is saved through the use of LED technology
Contractual guarantee of reduced operating energy costs through EPC projects
Without any need to use your own investment funds
We will transfer the risks of non-compliance with the operating parameters to ourselves
We will reduce the CO2 emissions of your buildings
We will reduce your dependence on your energy supply
Significant heating or cooling costs will be saved thanks to heat exchangers

They rely on us

CZECH TECHNICAL UNIVERSITY IN PRAGUE (CTU)

WHAT DID WE SUPPLY?

  • The most extensive Energy Saving Project (EPC) in the Czech Republic. Modernization of heating, air conditioning, lighting, as well as replacement of windows and doors, insulation and the subsequent energy management.
  • The project concerns a total of 30 buildings in 9 areas with dormitories and canteens.
  • The total amount of investment in the modernization of these premises is 232.4 mil. CZK. Almost a third of the investment was paid through a subsidy from the Operational Program for the Environment (OPE).
  • Water and sewerage costs will fall by a total of 5.1 million CZK.

„The modernization of CTU dormitories and canteens is one of the strategic investment goals that we have been solving at CTU in recent years, and the energy renovation is an integral part of it. If we can improve the quality of services to our students while saving on energy and water costs, it will be a great result.”
Doc. RNDr. Vojtěch Petráček, CSc., Rector of CTU in Prague

ČVUT

Savings per year

21.7 MILLION CZK

4,400 TONS OF CO2

Kongresové centrum Praha (Prague Congress Center)

What did we supply?

  • Modernization of the entire technological support system using the EPC method, where the solution supplier guarantees directly in the contract that the solution will generate the required savings.
  • Greater user comfort of the building, based on the new regulation system for heating and cooling of rooms, air ventilation, and more intensive but economical lighting.
  • Energy savings – gas 29% / electricity 53% / water 19%.

“We opted for the so-called EPC form, a method under which the solution provider guarantees directly in the contract that the solution will achieve the required savings. Probably every manager would raise his hand for an investment that pays off in ten years.” Lenka Žlebková, Sales and Marketing Director of the Congress Center

Kongresové centrum Praha

Savings per year

CZK 29.2 million
10,530 TONS OF CO2

Rudolfinum

What did we supply?

  • Modernization of the entire technological background using the EPC method (heating, cooling, air ventilation, lighting, regulation, and more).
  • Improvement and stabilization of indoor climate parameters.
  • Guaranteed 8 years return on investment.

“Artworks presented in the gallery require relatively precise temperature and humidity. While the load in the gallery area is more or less constant, a total of 1,200 people enters the concert hall at a time. In the course of this investment, we used the savings guarantee, state-of-the-art know how, and ENESA supervision over the entire project and its development. Ondřej H. Matyáš, Deputy for economy and operations, Czech Philharmonic

Rudolfinum

Savings per year

500 TONS OF CO2